Project & Client appears on the quotation header
Measurement Book / BOQ organised room-by-room, just like a site visit
Charges & Taxes
Totals
Subtotal (excl. optional)₹0
Discount− ₹0
Taxable amount₹0
GST₹0
Grand Total₹0
Optional add-ons₹0
Category Summary
| Add items to see the breakup |
Item Master defaults used when building a quotation — edit rates here without touching code
Item name
Category
Unit
Formula
Rate ₹
Wst%
Changes are saved automatically to this browser. Use Export to back up your master list.
Formula Types
| Formula | Base quantity | Typical use |
|---|---|---|
| L × H (Sq.ft) | Length(ft) × Height(ft) | Wardrobes, shutters, lofts, TV/pooja units, panels |
| L × W (Sq.ft) | Length(ft) × Width(ft) | False ceiling, painting, flooring |
| Running ft | Length(ft) | Counter length, profile light, skirting |
| Number | Quantity entered in Qty | Lights, drivers, electrical points, handles |
| Lump sum | Rate used as fixed amount | Transport, installation, design fee |
Unit Conversion & Wastage
| Unit | Conversion to feet |
|---|---|
| Inch | value × 0.0833333 |
| Millimetre | value × 0.00328084 |
| Feet | value × 1 |
Final quantity = Base quantity × (1 + Wastage% / 100).
Amount = Final quantity × Rate (except Lump sum, where Amount = Rate).